Protective cable duct section for Datacenter Equinix GmbH
Execution of excavation and pipe construction work to increase the possible carrier connections and optimise the redundant security concept on Equinix’s campus.
SWR GmbH also handled the engineering and construction of various above-ground cable entry points into the operational buildings at the Equinix data centre.
All work needed to be completed in compliance with strict safety regulations.
- Customer:
- Equinix GmbH
- Place of execution:
- Frankfurt am Main
- Duration of project:
- 2019 / 2020
- Execution:
- Südwestdeutsche Rohrleitungsbau GmbH
- Contract value:
- 1,0 Mio. EUR