Working space backfill at Riederwald data centre
In November 2020, a general contractor responsible for building data centres contracted SWR GmbH to backfill the working space at Riederwald data centre with RSS Flüssigboden liquid soil. The aim was to produce a force-fit joint between the shoring and the building structure.
Around 1,000 m³ of RSS Flüssigboden liquid soil was produced in our mobile liquid soil systems to backfill the working space and installed on site using a boom pump. This process posed no problems, even at low temperatures (2-5°C).
- Customer:
- Viabuild
- Place of execution:
- Frankfurt am Main
- Duration of project:
- December 2020 – January 2021
- Execution:
- Südwestdeutsche Rohrleitungsbau GmbH