Infraserv
This project involved suspending the DN 400 transport pipeline (river water) from D 787 S/O and repositioning six hydrants on the DN 1200 main transport pipeline.
Replacements were also carried out on the existing pipeline no. 19.00 on E 813.
An existing DN 400 pipeline was taken out of service and a new plastic DN 150 pipeline was installed. The connection to the existing flow meter was restored in the E 813 plant. This pipeline was subsequently put into operation.
Civil engineering grouted the DN 400-DN 150 network sections which were no longer required and then enclosed them with dished heads.
- Customer:
- Infraserv GmbH & Co. Höchst KG
- Place of execution:
- Höchst Industrial Park
- Duration of project:
- June 2016 – September 2016
- Execution:
- Südwestdeutsche Rohrleitungsbau GmbH