Südwestdeutsche Rohrleitungsbau GmbH

Südwestdeutsche Rohrleitungsbau GmbH

Südwestdeutsche Rohrleitungsbau

  • Home
  • Company
    • Our construction sites
    • Latest news
    • SWR
    • Locations
    • Our team
    • Certifications
    • Customers
    • History
  • Services
    • All-inclusive package
    • Cables
    • Gas
    • Heating
    • Liquid soil
    • Water
    • Reference projects
  • Career
    • SWR as an employer
    • Cooperative degrees
    • Training
    • Internship
  • Contact
  • DE
  • EN

Drinking water pipeline in Bischofsheim

We carried out welding work on a DN 800 steel drinking water pipeline over a 1000 m section for Keil und Purkl Tiefbau GmbH in Bischofsheim in the Mainz region.

The existing, ageing drinking water transmission pipeline was removed and replaced with a new one. In order not to interrupt the drinking water supply during the construction work, a d630 PE bypass needed to be laid before decommissioning.

A railway line needed to be crossed in an existing tunnel structure in one section.

Customer:
Keil und Purkl Tiefbau GmbH
Place of execution:
Mainz-Bischofsheim
Duration of project:
August 2019 - May 2020
Execution:
Südwestdeutsche Rohrleitungsbau GmbH
Contract value:
0.24 Mio. EUR

More references

91214-201209-Baufeldfreimachung-der-Neubautrasse-Nordmainische-S-Bahn-in-Hanau-Kabel_Komplettpaket1

Clearing the construction site for the new Nordmain commuter rail line

by siebel Cable
Mainzer Landstraße

Mainzer Landstraße

by siebel Water
20190716_120739

Heat supply pipeline universal line Ulm

by siebel Heating
Südwestdeutsche Rohrleitungsbau GmbH

There are only a few places
where we have not been active yet.

Useful links

  • Legal notice
  • Data privacy statement
  • Conditions of purchase
  • Contact form
Contact
  • Postal address: Intzestraße 14,
    60314 Frankfurt am Main
  • Phone: +49 69 944325-0
  • Fax: +49 69 944325-94
  • Email: info@swr-gmbh.de

© 2021 SWR Südwestdeutsche Rohrleitungsbau GmbH. Alle All rights reserved.

Shopping Basket