Dreieich
Civil engineering and pipeline construction work, including surface restoration for re-routing the high-pressure gas line no. 136 DN 200 PN 16 (ZMA) along a length of about 1,110 m. A new slide gate valve station was also constructed at the same time.
A new control cable was laid along the entire route in a DN 100 protective duct as part of the re-routing.
- Customer:
- Mainova AG
- Place of execution:
- Götzenhain, Dreieich, on the L 3317 road
- Duration of project:
- September 2016 – December 2016
- Execution:
- Südwestdeutsche Rohrleitungsbau GmbH
- Contract value:
- 0.4 Mio EUR